portfolio

The last designs

Year 2007
  • 18th of July 2007
    Kind of works: Complex designing service of the buildings’ modernization ,
    Design of the modernization of existing buildings Nordkalk sp. z o.o. – The Plant in w Miedzianka on the needs of magazines
    Size of investment: lack of data
    Investor: NORDKALK, sp. z o.o., Kraków, ul. Starowiślna 13,
    Description of the project: Modernization of the garages of the car transport in parts on the offices of magazines, in parts on the high-pressure washers, on the magazine rooms and on the genaral-office rooms and the technical rooms,
    Stages of designing: the building project , executive projects , the author’s supervision Branches: all (architecture/technology, construction , sewage systems , electric and teletechnical systems , dedusting and sprinkling systems),
    Specificity /difficulty of the project: The project of rooms destinied on the high-pressure washers ,the project of concrete trough in rooms destinied on the oils and greases’ magazine and on the magazine of used oils , modernization of the ventilation in the the office and technical rooms.
  • 17th of July 2007
    Kind of works: The complex designing service of the building investment,
    The New Mill in Wolica
    Size of investment: lack of data
    Investor: NORDKALK, sp. z o.o., Kraków, ul. Starowiślna 13,
    Contractual period of the project’s realization: 105 days,
    Description of the project: Project of the technological line of mill with the mill’s hall, shelter on the raw material, the transport line, squares and roads.
    Stages of the project: conception , receiving WZ and ZT, report of the environmental protection, environmental decision , building project, executive projects , the workshop projects , the author’s supervision,
    Branches: all (architecture/technology, construction , sewage systems , electric and teletechnical systems, the special projects cost calculations technical specifications,)
    Specificity /difficulty of the project: The project of specific technology including: mill, the charging hopper, project of steering the technological devices with visualization of the technological process, connecting the gas and heating oil to the Generator of Hot Gasses , the system of compressed air, issues of the environmental protection in the investment.
  • 09th of July 2007
    Kind of works:The building expertise
    Logistics of the snow drop for the office objects (buildings A,B and connector) located in Warsaw by the Postepu street 3
    Investor: Echo Investment S.A. 25-528 Kielce, Zagnanska street 27,
    Size of investment: lack of data
    Contractual period of the project’s realization: 115 days,
    Description of the expertise: The technical opinion has to include: * the accessible climatic loading by the snow with taking into account the designing solutions, * drawings with showed the next stages of the snow removal , roads of the snow transport, places of drop * methods of protecting the security of working people and pedestrians * drawings with the solution of fastening the protective lines , * procedures of behavior in the emergency cases * project should be accepted taking into account the BHP.
    Branches: architectural , constructional
    Specificity /difficulty of the project: Analysis of the snow loading according to Euro Code with the analysis of fortune factors of uncertainty with the distinction of the factors accepted on the stage of designing and the factors concerning the dimensions of the existing snow loadings. The tasks of monitoring of the snow loading.
  • 09th of July 2007
    Kind of works: Building expertise
    Logistics of the snow drop for the objects Athina Park (4 buildings with the repeatable construction)
    Investor: Echo Investment S.A. 25-528 Kielce, Zagnanska street 27,
    Size of investment: lack of data
    Contractual period of the project’s realization: 115 days,
    Description of the expertise: The technical opinion has to include: * the accessible climatic loading by the snow with taking into account the designing solutions, * drawings with showed the next stages of the snow removal , roads of the snow transport, places of drop * methods of protecting the security of working people and pedestrians * drawings with the solution of fastening the protective lines , * procedures of behavior in the emergency cases * project should be accepted taking into account the industrial safety.
    Branches: architectural, constructional
    Specificity /difficulty of the project: Analysis of the snow loading according to Euro Code with the analysis of fortune factors of uncertainty with the distinction of the factors accepted on the stage of designing and the factors concerning the dimensions of the existing snow loadings. The tasks of monitoring of the snow loading.
  • 20 of June 2007
    Kind of works: Complex designing service of the building investment,
    The designing service of „Extension of the Kettles’ Plant SEFAKO S.A> with the production hall 28.1. with the social-office part and infrastructure.
    Investor: The Kettles’ Plant SEFAKO S.A. in Sedziszow, Przemyslowa street 9, Size of investment: lack of data
    Contractual period of the project’s realization: about 100 days (to the building permit) and next to finishing the building,
    Description of the project: The designing service concerns the multi-sectored project of the objects in state “under the key”. Elaboration concerns all the branches for: buildings, structures, car parks, green area, fence and other building objects, all general building systems, networks and terminals .Project should also include the documentation necessary to the equipment of investment , also to assembling the machines and devices. The scope of contract does not include the services of the Supervision Inspector and the elaboration of the maps to the designing aims.
    Stages of the project: the technological and building-architectural conception , the building project in all branches with receiving the permission on the building , the tender projects , executive projects , the workshop projects , the author’s supervision.
    Branches: all (architecture/technology, construction , sewage systems , electric and teletechnical systems, the special insulations, cost calculations, technical specifications and the water- lawful evaluation, report of the environmental protection )
    Specificity /difficulty of the project: The project of specific technology including: the craneman devices, the production devices and system in the assembling hall in the Kettle’s Plant , devices in the flaw detectoring laboratory
  • 01 of June 2007
    Kind of works: Complex designing service of the building investment,
    Design of the salon of cars’ sale AUTO-SKAR in Kielce by the Radomska street
    Investor: AUTO-SKAR sp. z o.o., Pilsudskiego street no 2, Skarzysko-Kamienna
    Size of investment: lack of data
    Contractual period of the project’s realization: about 150 days
    Description of the project: The project includes the peparation of the descriptive and drawing documentation necessary to the realization of investment in all branches for: the buildings, structures, car parks, green area, fence and other building objects, all general building systems, networks and terminals
    Stages of the project: the architectural-building and technological conception, the building project in all branches with receiving the allowance on building, the executive projects and the author’s supervision,
    Branches: all: architecture/technology, construction , sewage systems, electric and teletechnical systems, the special insulations, cost evaluations, take-offs, cost evaluations including the water-lawful evaluation (?), report of the environmental protection and other specialist elaborations required to performing the investment.
    Specificity /difficulty of the project: The project of specific technology, salon of the cars’ sale, workshop and the washing stand.
  • 31of May 2007
    Kind of works: Project of construction,
    The changeable building and executive project of the housing complex by the Wojska Polskiego street no 41 in Warsaw
    Mandator: KAPS Architekci Warszawa
    The designing consortium: Project of the construction of buildings – housing apartments performed on the order of leading Architectural Workroom
    Size of investment: lack of data
    Contractual period of the project’s realization: to finishing of the building
    Description of the project: Preparation of the working documentation on the order of leading Architectural Workroom includes the changeable drawings (revisions of the drawings) because of the functional changes of the buildings. The housing buildings in the ferroconcrete sheet-pillared construction.
    Stages of the project: The executive and workshop projects
    Branches: the ferroconcrete construction
    Specificity /difficulty of the project: Optimization of the ferroconcrete constructions in the complex static schemes modeled spatially.
  • 29/30 of May 2007
    Kind of woks: The executive project of the construction,
    The executive project of the construction of The Tyres’ Plant BRIDGESTONE in Stargard Szczecinski
    Mandator: Polimex Mostostal S.A.
    The designing consortium: The leading designing unit is ART-PROJEKT from Stargard Szczecinski. This order was conveyed to Art-Projekt / Chodor-Projekt in branches Architecture / Construction, with exclusion of internal installations. The internal installations : sewage system, electric and teletechnical are the subject of separate order.
    Size of investment: lack of data
    Contractual period of the project’s realization: to finishing of the building
    Description of the project: Preparation of the working documentation on the order of the Performer Polimex Mostostal S.A., concerns all the constructions of the factory’s objects , both the buildings and objects of the infrastructure of the area , including: the ground constructions, ferroconcrete, steel , brick, wooden and all the others.
    Stages of the project: The executive and workshop projects
    Branches: construction
    Specificity /difficulty of the project: the project of the reinforcement of the non-controlled banks, design of the foundations and supporting constructions under the machines and production machines of the tire’s factory, the project of construction under the supported and suspended transport, project of the industrial floor.